Projects
- Mege Inc. - Aydın (68.45 MW)
- Maren Inc. - Aydın (150.80 MW)
- Ken-Kipaş Inc. - Aydın (48.80 MW)
- Mis Energy Inc. - Manisa (60.3 MW)
- Sanko Energy Inc. - Manisa (70.4 MW)
- MTN Energy Inc. - Çanakkale (8 MW)
- Enerjio Inc. - Manisa (24.90 MW)
Services
- Earth Sciences
- Drilling Services
- Production
- Reservoir Studies
- Economical Analysis
- Geothermal Power Plant Design and
Performance Analysis
- Economical Assessment
News
12.05.2020
Soyak Energy Group released new movie about Mis-1 and Mis-3 Geothermal Power Plants provided by NTU Jeotermal consulting services.
15.10.2019
Salihli-2 GPP (25 MWe) and Salihli-3 GPP (30.2 MWe) provided by NTU Jeotermal consulting services, have started producing electricity.
15.10.2019
SOYAK MİS-3 GPP (48 MWe), provided by NTU Jeotermal consulting services, has started to producing electricity.
25.04.2019
VELIKA-1, the first GPP in Croatia provided by NTU Jeotermal consulting services, has started producing of electricity at the end of the 2018.